6:50am- At RR03 site for a meeting with the contractor and Property Owner.
Boring contractor appears to be doing good. Looks like another 10’ of casing is in, which brings the total footage to 30 now.
9:45am- another 5’ of casing is now in. Meeting with the Property owner went well.
I’m headed offsite.