7:30am- Excavator will continue cleanup on 12” line area.
7:45am- work will be underway on Access Rd 3 today as haul truck is onsite. Material from blasted areas will be hauled up from the bottom and placed on roadway.
10:53am- material being dumped at tree line headed out the roadway.
Overall view of area in bottom of access 3.
1:20pm- Two manhole bases are loaded and will be hauled to the bottom today.
3:05pm- After another walk in today more rock is getting dug up and hauled to be put on the roadway.
Blasting crew working in areas where they are not hitting water at this time.
3:40pm- As Im walking out I see this. I have asked Chris to be extremely careful around the trees that are flagged as these are the specific ones that the property owner was wanting to keep and not harm. Roadway is getting cut to deep and roots are starting to show.
4:20pm- I am now headed to the Liftstation site at the WWTF. I have also asked that trash be kept picked up so that it doesn't get out of control.