7:25am- Iowa Trenchless is not onsite at this time.
7:50am- More manholes are unloaded at Access Road 3.
9:43am- Back at MH A20. Ditch is full of water and since its all been blasted now, all the rain water is following ditch line.
Pump is running, but they will need the bigger pump foresure.
11:25am- 6” pump now at MH A20.
3:05pm- One of the trackhoes blew a hose and while it hets repaired the roadway here at the bottom is getting shot rock placed on it.
5:05pm- no pipe laid today.
No comments:
Post a Comment