6:35am- straw and seed getting water this AM. More brackets to be installed in wet well. General cleanup will also be occurring.
7:20am- more seed and straw going down where materials were being stored.
4:35pm- all but two pipe supports have been installed now.
USF Hatches have been supplied and appear to meet the requirements of the submittals that were approved.
Generator has been slid onto wetwell about 12” or so and controls panels are now staying were they are at per the District’s personnel whom of which met with Dale the electrician today.