Turkey Creek Ph 1 - Flat Creek (Line Work)


6:45am- Rock breaking near MH A2 continues today along with “flushing” of the lines. 
8:03am- crew getting equipment ready to begin “flushing” lines. 

10:10am- crew filling lines at MH A26 with a plug at MH A25 upstream side. Once full, plug will be pulled to send the water through the pipe, hopefully scouring it. 

10:26am- MH E1 is now overflowing. Plug will be pulled at A25. 

10:32am- plug is pulled and out of the way now. The water appears to be cleaning pipe due to the color. 



10:36am-  almost empty now. 

12:31pm- getting ready to flush again at MH A24. 

12:50pm- flushing again at MH A24. View from A25. 

3:24pm- plug is pulled now at MH A23. This will be the last flush for today. 

3:47pm- water entering bore pit at WWTF from flushing events. 

3:56pm- still rising. 

4:00pm-More rock to break to get MH A2 placed. 