6:55am- rock breaking at WWTF near MH A2 area is going slow.

7:58am- Fence work continues today on Rittenhouse at MH A19 area.
7:58am- Fence work continues today on Rittenhouse at MH A19 area.
9:00am- 12:30pm: walked South end of Interceptor Line with engineer and contractors.
1:19pm- fence work now at area between MH A7-A8.

4:30pm- excavator moves to break rock from below as upper area is now to steep to sit on with excavator.
1:19pm- fence work now at area between MH A7-A8.
4:30pm- excavator moves to break rock from below as upper area is now to steep to sit on with excavator.
Breaking will continue as manhole A2 location is on back another 20’ or so.